Individual Project — To-do

Ten steps from question to presentation · mark each step as you go

The project is an individual project with data material selected by the student, presented orally and in writing, at roughly the complexity of a mixed model. Each step below has a status control (Not started / In progress / Done) that is saved in your browser and summarised on the dashboard. The steps link back to the module sections they rely on.

ImportantDates

Check Canvas for the official dates and format; this page gives study advice, not requirements.

  • Mon 19 October 2026: data and research question settled (Announcement 3).
  • Wed 28 October 2026: project deadline.
  • Thu 29 October 2026: project presentations, 15–25 minutes each.

What counts as “Bayesian enough”?

From the teacher’s guidance on projects (Announcement 3):

  • Do something in a Bayesian way. A coefficient in a linear model with weak priors on a large dataset is not enough: it is numerically a frequentist fit.
  • The prior matters when the information per parameter is small: small groups, rare categories, few observations per unit, few studies. That is why a GLMM is the reference level (Module 5).
  • Pragmatic use is fine: models that are hard to fit otherwise (Gamma, multinomial, ordinal, zero-inflated, hurdle, values below a detection limit), as long as the coefficients are interpreted with care.
  • Large datasets are allowed, but MCMC gets slow: subsampling is fine.
Parameter Information Does the prior matter?
A coefficient estimated from all rows many observations hardly: say so
An effect for a small group or cell few observations yes: partial pooling, hyperprior sensitivity
A between-group SD with few groups (or few studies) as many units as groups a lot
A quantity derived from several parameters inherits all their uncertainty the draws give it directly

A convincing check for the report: fit the model with and without informative priors (or by maximum likelihood) and show where the results differ.

The ten steps

Step 1 · Research question and estimand

Relevant: 1.5, 4.11, 5.5.

Step 2 · Data: source, selection, cleaning, missing values

Step 3 · Model: likelihood and structure, written out

Step 4 · Priors and a prior predictive check

Step 5 · Fit and check convergence

Step 6 · Posterior predictive checks

Step 7 · Compare alternative models

Step 8 · Sensitivity analysis

Step 9 · Estimands from the draws: tables and figures

Step 10 · Write-up and presentation

  • Interpreting the summary before checking diagnostics.
  • Reporting parameters on the log-odds scale without translating them.
  • Calling the 95% interval a confidence interval, or interpreting it as one.
  • Leaving default priors without saying what they are.
  • Showing only pp_check(fit) for a binary outcome: use stat and stat_grouped.
  • Treating estimates that rest on few groups or studies as precise, without a prior sensitivity analysis.